Baumann Sideloaders News
Wolfgang Baumann
We are deeply saddened to report the death of our co-founder and honorary Chairman, Mr Wolfgang Baumann, who has passed away peacefully, aged 83, in the presence of his wife Francesca in Cavaion Veronese.
Baumann Reaches For Innovation
We are delighted to announce new improvements to our 120-volt ELX Series, including additional reach capability which could dramatically increase customer storage capacity.
Production Gains For Electric Sideloaders
For the first time in over 50 years, Baumann is producing more electric sideloaders than diesel models with 65% of deliveries to Europe coming from the 120V EGX and ELX ranges.
Baumann Sideloaders Supporting The 2020 Timber Trades Journal Awards
We are delighted to be a main category sponsor at this year's TTJ Awards!
New dealers for Portugal
Mobilift is the new name for Baumann sideloaders in Portugal.
Back to Business
Following the Italian government announcement to begin exiting the lockdown from 4 May, 2020, we are now working towards returning our production facilities back to full capacity by 8 May.
Stay safe. We will be back very soon!
Once again we would like to send a big ‘thank you’ to all those sending us their thoughts and well wishes during the Covid-19 outbreak.
Delivering For Lockheed Martin
A new fleet of adapted GX models for Lockheed Martin features next generation diesel engines, re-designed chassis, refined ergonomic cabins, and measures to counteract a complete engine cut-out.
LogiMAT 2020 Announcement
Unfortunately, as a precautionary measure we are cancelling our participation at this year's LogiMAT exhibition in Stuttgart.
First ELX Arrives In Canada
The first electric sideloader in Canada, the ELX50, has been delivered to leading materials handling specialists, Cervus Equipment.
Technology Breakthrough Aids Barrier Work
Bespoke versions of the latest Baumann side loader forklift are being used by safety barrier installers on UK motorways.
Award-Winning Electric Sideloaders At LIGNA
Baumann heads to LIGNA with two of our latest electric models, the EGX and EHX series.
New Production Hall Takes Shape
It's taken an investment of around 2 million euros; a little over 7 months; 3,000 cubic metres of concrete and almost 200 tonnes of steel to get our new production hall off the drawing board, but we are almost ready!
Thank You!
A huge 'Thank You' to all those that attended our special event and to those that sent their congratulations, well wishes and gifts (too many to fit in one picture!) in celebration of our 50th anniversary. We are very grateful and honoured by your continued support and partnerships with us!